LTU is getting ready for Oksla measurements

On Thursday the 28th of September, just one day after the Porjus tests, the two IPM rods were dismantled from the Porjus U9 draft tube. The plan is to send the IPM to Norway next week, and the measurements are planned during week 41.

One of the IPM rods upon disassembly from the draft tube cone.