On Wednesday the 13th of September, LTU was visiting Porjus to inspect the recently installed IPM systems. Last week, the U9 turbine was commissioned and the IPM system was installed during these initial tests. Today’s inspection was performed in order check the integrity of the IPM system, before the real AFC4Hydro tests start.